Sept.
- The foundation and floor are poured for the additional two bays and
the walls start to go up for the office and kitchen.
|
Oct.-
The structure takes shape over the two bays.
|
Oct.
- A closer look of the new bays.
|
![]() |
||
|
Oct.-
An interior view from the left bay looking into the office area (left),
connecting 4 ft. hallway, and kitchen area (right).
|
Oct.-
Standing in the left bay looking toward the rear. Restroom (left), storage
room (center and right), and elevated storage (above). A work bench, work
area and utility sink will be placed on the rear wall.
|
|