Fire Station Addition Under Construction - Sept / Oct 2000
(Click on any photo to see a larger picture.)

 

Sept. - The foundation and floor are poured for the additional two bays and the walls start to go up for the office and kitchen.
Oct.- The structure takes shape over the two bays.
Oct. - A closer look of the new bays.
Oct.- An interior view from the left bay looking into the office area (left), connecting 4 ft. hallway, and kitchen area (right).
Oct.- Standing in the left bay looking toward the rear. Restroom (left), storage room (center and right), and elevated storage (above). A work bench, work area and utility sink will be placed on the rear wall.

 